OUR PROJECTS

RED BULL SANTA MONICA

This project included removing a massive skateboard ramp that was built over the top of much of the existing office space.

THE DETAILS

The ramp needed to be removed with additional care and caution, so as not to disturb the occupied office space below and around. The property remained occupied with business as usual, throughout the entire demolition process.

Demolished Since 2015
1740 Stewart Red Bull HQ Ramp = 8,800 Sf.
Have a Job for us?
Let’s Get Started